FIFTY OAKS
Project 1622
Forward all questions to Ussery Rule Morelan Architects URarch@URarch.com
CONSTRUCTION DRAWINGS PHASE 1 - 2
Building 1 - Revised 02/11/2022 - 8078 KB (*.PDF FILE)
Building 2 - Revised 03/04/2022 - 8528 KB (*.PDF FILE)
Building 3 - Revised 03/04/2022 - 6279 KB (*.PDF FILE)
Building 4 - Revised 10/21/2022 - 6170 KB (*.PDF FILE)
Building 5 - Revised 04/25/2023 - 4960 KB (*.PDF FILE)
Building 6 - Revised 11/29/2022 - 5816 KB (*.PDF FILE)
Building 7 - Revised 11/29/2022 - 4960 KB (*.PDF FILE) ** includes exterior elevations
Building 12 - Revised 10/21/2022 - 5805 KB (*.PDF FILE)
Building 13 - Revised 04/26/2023 - 6195 KB (*.PDF FILE)
CONSTRUCTION DRAWINGS PHASE 3
PHASE 3 UNIT PLANS FOR MARKETING
Marketing Unit A - Revised 08/03/2033 - 243 KB (*.PDF FILE)
Marketing Unit B - Revised 08/03/2023 - 244 KB (*.PDF FILE)
Marketing Unit C - Revised 08/03/2023 - 253 KB (*.PDF FILE)
SHOP DRAWINGS
Building 4 floor / roof shops - 10/21/2022 - 485 KB (*.PDF FILE)
Building 5 floor / roof shops - 10/21/2022 - 446 KB (*.PDF FILE)
Building 12 floor / roof shops - 10/21/2022 - 540 KB (*.PDF FILE)
STAIR DETAIL
Stair Detail Unit A - 05/12/2023 - 222 KB (*.PDF FILE)
ADDITIONAL DOCUMENTS
Site Plan - Revised 09/04/2024 - 772 KB (*.PDF FILE)
Fiber Mesh Substitution for Welded Wire Mesh - 09/04/2024 - 249 KB (*.PDF FILE)
Civil - 11/11/2019 - 59855 KB (*.PDF FILE)
Environmental Assessment 2018 - 14561 KB (*.PDF FILE)
Hydraulic Conductivity SHGW - 1088 KB (*.PDF FILE)
Seasonal High Ground Water Infiltration Rate Testing - 213 KB (*.PDF FILE)